TTS+ Associates

Our Services

 Urban Planning and Urban Design

Architecture Design

 Interior Design

Landscape Design

3D Visualization Service

Construction Service

Finishing – One Stop Package Service

TTS+ Associates

Design Procedure

Step 1: Determine the construction category

Measurement and taking existing picture on site to estimate timeline and inform for Party A

Step 2: Layout plan

Making analysing diagram, function zoning…to present for 2D layout 

Step 3: 3D Isonometric

⇒ 3D images and layering models
⇒ To indicate wall and partition
⇒ To indicate volume of separate furniture through their occupied space

Step 4: 3D Illustration

⇒ To indicate Materials, color tone and lighting effect for project
⇒ To indicate ceiling – wall – floor system
⇒ To Indicate arrangement of separate furiture items & plants if any.

Step 5: Design finalization

⇒ 2D Layout
⇒ Diagram-3D isometric
⇒ 3D perspective
⇒ Details technical drawing for execution
⇒ Statistics of detailed BOQ, list of finishing materials and items

TTS+ Associates

Construction Procedure

Step 1: Plain clearance

⇒ Carry out demolition if any
⇒ Check and sign on the minutes of plain hand-over

Step 2: Verification of available system

⇒ Air conditioner, ventilation, electrics, fire alarm and protection
⇒ PA system (Public address system)
⇒ Water supply and drainage system
⇒ Check in and Check out
⇒ On-site measurement and physical verification

Step 3: Progressive execution

⇒ Electrics and water, Internet, fire alarm and protection, air conditioner water system
⇒ PA system
⇒ Ceiling construction
⇒ Flooring construction
⇒ Wall and partition construction
⇒ Integrated interior
⇒ Separate items and equipments

Step 4: Cleaning up

⇒ Painting and finishing wall, ceiling and floor
⇒ Industrial cleaning

Step 5: Handing over 

⇒ Physical check of the system before handing over
⇒ Hand over the systematic layouts (electrics, lighting, networks…)
⇒ Run systematic operation