Urban Planning and Urban Design
Architecture Design
Interior Design
Landscape Design
3D Visualization Service
Construction Service
Finishing – One Stop Package Service
TTS+ Associates
Design Procedure
Step 1: Determine the construction category
Measurement and taking existing picture on site to estimate timeline and inform for Party A
Step 2: Layout plan
Making analysing diagram, function zoning…to present for 2D layout
Step 3: 3D Isonometric
⇒ 3D images and layering models
⇒ To indicate wall and partition
⇒ To indicate volume of separate furniture through their occupied space
Step 4: 3D Illustration
⇒ To indicate Materials, color tone and lighting effect for project
⇒ To indicate ceiling – wall – floor system
⇒ To Indicate arrangement of separate furiture items & plants if any.
Step 5: Design finalization
⇒ 2D Layout
⇒ Diagram-3D isometric
⇒ 3D perspective
⇒ Details technical drawing for execution
⇒ Statistics of detailed BOQ, list of finishing materials and items
TTS+ Associates
Construction Procedure
Step 1: Plain clearance
⇒ Carry out demolition if any
⇒ Check and sign on the minutes of plain hand-over
Step 2: Verification of available system
⇒ Air conditioner, ventilation, electrics, fire alarm and protection
⇒ PA system (Public address system)
⇒ Water supply and drainage system
⇒ Check in and Check out
⇒ On-site measurement and physical verification
Step 3: Progressive execution
⇒ Electrics and water, Internet, fire alarm and protection, air conditioner water system
⇒ PA system
⇒ Ceiling construction
⇒ Flooring construction
⇒ Wall and partition construction
⇒ Integrated interior
⇒ Separate items and equipments
Step 4: Cleaning up
⇒ Painting and finishing wall, ceiling and floor
⇒ Industrial cleaning
Step 5: Handing over
⇒ Physical check of the system before handing over
⇒ Hand over the systematic layouts (electrics, lighting, networks…)
⇒ Run systematic operation
